ASU Block 12

ASU Block 12

INTEC has been involved in providing design support services for this five story classroom and administrative phase. This project also includes many sustainable and aspects and green design features:

  1. A ventilated façade to reduce exterior surface temperatures
  2. Opportunities for building integrated photovoltaic/solar-thermal technologies
  3. Natural ventilation of atrium spaces
  4. Solar hot water heating for domestic and/or building heat
  5. LED lighting in some or all areas
  6. Water harvesting for storage and reuse

PROJECT DETAILS

INTEC Client type General Consultants
Location Arizona, USA
Duration 3 Months
Built Area 130,000 SQ. FT.
Trades Covered Architecture, Structure, Mechanical, Electrical, Plumbing and Fire Protection
Brief Scope Complete CD stage modelling for Architecture, Structure, Mechanical, Electrical, Plumbing and Fire Protection